Wednesday, July 14, 2010

We have changed our mailing address.

Please update your records with the address below.




Victory Contract Sales, LC
P.O. BOX 414333
Kansas City, MO 64141

Tuesday, July 13, 2010

Another Victory!

We just completed the Charles B. Wheeler Downtown Airport – GA Terminal project featuring Ceco MADERA Stainable Steel Doors


The Look and Feel of a Wood Door - The Strength and Durability of a Steel Door


Ceco Madera offers the natural beauty of wood in a durable, fire-rated, and stainable steel door. The wood-grain pattern is actually etched in the metal, not painted on. Six attractive natural stain finishes offer a palate of decorating options. The door is finished with a tough, clear top coat with ultraviolet protectors. It looks and feels like wood. But it won’t warp, rot or otherwise wear and weather like wood. Doors can be fire rated up to 3 hours following typical fire-rated door restrictions based on series, gage and size.


• Rich wood grain pattern engraved into a stainable steel surface
• Available in stained natural wood tones with accessories and trim to match.
• Tough, clear top coat with UV protectors
• Glass lights feature frame trim finished to match door
• Factory stained in your choice of stain colors
• .005" deep engraved grain pattern
• Single or double openings - handed
• Available Fire rated - from 20 minutes up to 3 hours
• Polystyrene core provides structural strength and resists impact
• Insulated, general purpose, rated Standard to Extra Heavy-Duty
• Moisture and vermin resistant
• 1-3/4" (44.4mm) Door Thickness
• Steel gage: 20 (0.8 mm), 18 (1.1 mm), 16 (1.4 mm)
• Galvannealed steel face sheets
• Widths: 2'0" (610 mm) to 4'0" (1219 mm)
• Heights: 6'8" (2032 mm) to 8'0" (2438 mm)
 


View Larger Map

Monday, March 22, 2010

Nation's First Set of Model Codes and Standards for Green Building in the U.S.

ICC, ASHRAE, USGBC and IES Announce Nation's First Set of Model Codes and Standards for Green Building in the U.S.

Organizations representing building safety professionals, energy and lighting engineers, green building practitioners, architects and technical standards developers have all come together to establish a comprehensive green building code designed to rapidly advance green building practice across the U.S., according to a news release.

Monday, February 22, 2010

Charles B. Wheeler Downtown Airport's All-Purpose GA Terminal Facility

We have just shipped the hollow metal door frames for the Kansas City Charles B. Wheeler Downtown Airport's all-purpose GA Terminal Facility. The airport is undergoing a $100 million facelift.

Read...

Friday, January 29, 2010

Missouri high-speed rail work will employ 190, require preliminary engineering for $100M in projects - Kansas City Business Journal:

Missouri high-speed rail work will employ 190, require preliminary engineering for $100M in projects - Kansas City Business Journal:

Xcel Energy hires Burns & McDonnell for power plant project - Kansas City Business Journal:

Xcel Energy hires Burns & McDonnell for power plant project - Kansas City Business Journal:

U.S. economy posts fastest growth in six years in fourth quarter - Kansas City Business Journal:

U.S. economy posts fastest growth in six years in fourth quarter - Kansas City Business Journal:

BOMA International Launches New Office Measurement Standard

BOMA International Launches New Office Measurement Standard

GDP explodes by 5.7% in the fourth quarter - 2010-01-29 16:38:11 | Purchasing.com

GDP explodes by 5.7% in the fourth quarter - 2010-01-29 16:38:11 Purchasing.com

Recovery.gov

Recovery.gov is the U.S. government’s official website providing easy access to data related to Recovery Act spending and allows for the reporting of potential fraud, waste, and abuse. SEE FEATURED VIDEO.


Federal ARRA Project - Signal Synchronization Center Phase II, Kansas City

The city of Kansas City is upgrading the current Traffic Operations building which is part of the Traffic Control Center. The Traffic Operation Building is located at 5320 Municipal Avenue. This Center will provide signal synchronization of the City’s signals and is the first phase of three phases.

Read the summary sheet...

Saturday, January 23, 2010

Music City Center approved - Nashville Business Journal:

Music City Center approved - Nashville Business Journal:
Nashville's Metro Council approved the largest municipal project in state history Tuesday night. The vote was 29-9.